Fryx Industrial Partner is a consultant company, founded year 2011 and has its base in Örebro, Sweden.

The company delivers quality engineering services to technology companies, manufacturing- and automotive industries.

With in-depth knowledge and experience in project management, manufacturing engineering and robotic automation, we increase the customer's efficiency, profitability and competitiveness.

The degree of automation and more effective production methods is continuously growing and manufacturing companies is obliged to follow this trend to stay alive and be more efficient then their competitors.

Fryx Industrial Partner intends to help manufacturing industries to take the step into the future of production.

 

 

 

Competences

Project Management

  • Automotive industry
  • Automation integration
  • Volvo Project Model

 

Manufacturing- and Automation Engineering

  • Robotic welding
  • Manual welding
  • Welding fixtures
  • Robotic simulations, offline programming, reachability-, collision-, and cycle time studies
  • PFMEA
  • PPAP
  • Proposals for design and production adaptations for higher quality and output
  • CE Marking and risk assessment of industrial automation
  • Ergonomically working environments
  • Operation manuals for Machines and automation
  • Time studies and performance evaluation
  • Experience from doing MTM- and SAM analysis
  • Balancing of manufacturing lines
  • Work- and maintenance instructions
  • Factory layouts
  • Development of requirement specifications
  • Manufacturing preparation (MPS)

 

Continues Improvements

  • Identifying the cause of losses in terms of availability-, cycle time- and quality losses
  • Root cause analysis A3
  • Gemba attitude - go to the place where it actually happens
  • PDCA
  • Evaluate improvements and making correct priorizations

Latest Assignments

[2014 - 2015] Task Manager for cross-functional improvement team on high volume line

Automotive Industry

(Nyköping, Sweden)

Eberspächer Exhaust Technology Sweden AB

Responsible leader of a cross-functional improvement team with the aim to increase volume and improve quality on main assembly line for Daimler Mercedes Benz Actros high volume Euro VI exhaust systems.

Result: +30% in production volume with better quality of end product. Improvement enabled the company to remove one complete production shift from main assembly line.

Read reference from Eberspächers manufacturing manager under references.

 

[2013 - 2014] Project management

Automotive Industry

(Nyköping, Sweden)

Eberspächer Exhaust Technology Sweden AB

Responsible project manager for building up, commissioning and ramp-up of main assembly line for Daimler Mercedes Benz Actros low volume Euro VI exhaust systems. In total are over 120 ferritic- and austenitic metal parts welded together with over 30 m of welding. The line consists of very advanced automatic welding fixtures, 14 welding robots, 2 handling robots on servo tracks, 5 automatic leak test machines, manual assembly area for completion of end product and 1 automatic robot cell for dimensional measuring of end product. The line is built with a tack time of 13 min and 52 sec.

 

[2012 - 2013] Project management

Automotive Industry

(Nyköping, Sweden)

Eberspächer Exhaust Technology Sweden AB

Responsible project manager for building up, commissioning and ramp-up of main assembly line for Daimler Mercedes Benz Actros high volume Euro VI exhaust systems. In total are over 120 ferritic- and austenitic metal parts welded together with over 30 m of welding. The line consists of very advanced automatic welding fixtures, 40 welding robots, 7 handling robots, 7 automatic leak test machines, manual assembly area for completion of end product and 1 automatic robot cell for dimensional measuring of end product. The line is built with a tack time of 5 min and 17 sec.

 

[2013] CE-Marking of robot handling cell

Polymeric Industry

(Hallsberg, Sweden)

Nolato Silikonteknik AB

CE-Marking of robot cell for filling and packaging of silicon tubes on behalf of El & Teknik Hammar AB.

 

[2011 - 2012] Technical Responsible

Automotive Industry Project

(Nyköping, Sweden)

Swenox AB

Technical responsible to technically complete, update and start-up main assembly line for Daimler Mercedes Benz Actros Euro V exhaust systems. In total is over 120 ferritic parts welded together with over 30 m of welding.

The line consists of 13 welding robots, 4 handling robots on servo tracks, 2 automatic leak test machines and 12 manual welding stations.

At the time Fryx Industrial Partner stepped into the project the time until SOP was very short and it was an extreme risk that Swenox would fail to deliver to customer.

Before update the line delivered 1 unit/day, after update and ramp-up the line delivered more than 90 units/day.

Read reference from Swenoxs head project manager under references.